Your shopping cart is empty!
The Domus TROPIX 4-in-1 Standard is a slimline bathroom heater 2,250W, 500m/h extraction, twin DCmotors, 595280mm cutout, with a switchable1,8002,100lm light, in white or black. Its power field says 25…
The Domus TROPIX 4-in-1 Standard is a slimline bathroom heater 2,250W, 500m/h extraction, twin DCmotors, 595280mm cutout, with a switchable1,8002,100lm light, in white or black.
Extraction is 500m/h through a 150mmduct. THAT FIGURE IS A FREE-AIR RATING AND THE DUCT RUN WILL REDUCE ITSUBSTANTIALLY. Every bend costs flow, flexible duct costs more than rigid, and a longrun costs most of all. The commonest cause of a bathroom heater that does not clearsteam is not the appliance it is six metres of concertina’d flexible duct with threebends. Keep the run short, keep it as straight as the roof allows, pull the flexibleduct taut rather than leaving it compressed, and make sure the exterior grille is a free-flowing one ratherthan a fine mesh. A 3m flexible duct and an exterior grille areincluded.
1,800lm at 3000K, 2,100 at 4000, 1,900 at 5000, CRI 80,changeable. THAT IS ENOUGH TO BE A BATHROOM’S MAIN LIGHT in most rooms, which is nottrue of every heater in this range. Note 4000K is the brightest, not5000. CRI 80 is adequate for general bathroom use and below what you would want at amirror for close colour work, so a higher-CRI vanity light is worth having alongside if anyone does makeupin the room. A 5-gang rocker wall switch is included, which is what four functions plusa light requires.
| Specification | Value |
|---|---|
| power_watt field | 25W the LAMP; the appliance is 2,250W |
| Measured | 8 of 9 heaters understate the STREAM is correct |
| Real load | 9.4A = 94% of a 10A circuit |
| Dedicated circuit | Required nothing says so |
| Cutout | 595 280mm 0 of 843 records publish one |
| Which is a carpentry job | Longer than a 450mm joist gap trim and noggin |
| Twin DC motors | Heat and extract at once 60W the pair |
| PTC element | Self-limiting safer in an insulated cavity |
| Extraction | 500m/h is FREE AIR the duct run reduces it |
| Light | 1,800 / 2,100 / 1,900lm a real main light |
4-in-1 bathroom heater heater, exhaust fan, circulating fan and light. 2,250W at240V AC, twin DC motors, 60W. PTC element. 500m/h extraction, 150mm duct. Light1,800/2,100/1,900lm at 3000/4000/5000K, CRI 80. Cutout 595 280mm, fascia 615 315mm. 5-gang rocker wall switch, 3m flexible duct and exterior grille included. 5-yearwarranty per the description spec block. ITS POWER FIELD PUBLISHES 25 W ON A 2,250 W APPLIANCE the LED light’s wattage, understatedninety times. Of 9 bathroom heaters where both figures can be read, 8 understate by more than tenfold andone, the STREAM, is correct which is what makes the eight errors rather than a house convention. THE REALLOAD IS 9.4 AMPS, 94% OF A STANDARD 10 A LIGHTING CIRCUIT ON ITS OWN, and nothing says it needs a dedicatedone. ITS SHEET ALSO PUBLISHES A CUTOUT 595 280 mm WHERE 0 OF 843 RECORDS IN THIS CATALOGUE CARRYONE. That figure decides the job: 595 mm is longer than the clear gap between joists at 450 mm centres, soit needs a joist trimmed and noggins added, and it cannot be corrected once cut.
Supplied and supported by Lights For You.
Does it really use 25 watts?
No 2,250. The 25W on its record is the LED light’s wattage, understated ninety times. Of 9 bathroom heaters where both figures can be read, 8 understate by more than tenfold and one is correct; the STREAM publishes 2,250W properly, which is what makes the other eight errors rather than a house convention. The worst is the THERMAFLOW at 12W on a 2,150W appliance.
Can it share a lighting circuit?
No. 2,250W at 240V is 9.4 amps, which is 94% of a standard 10A lighting circuit on its own. It needs a dedicated circuit and nothing on the listing says so. Tell your electrician the real figure before the walls close adding a circuit at rough-in is routine, adding one afterwards means chasing walls.
What size hole does it need?
595 x 280mm, in a 615 x 315mm fascia about 20mm of cover each way. That comes from the datasheet, because the product record publishes no cutout: 0 of 843 records in this catalogue carry a cutout metafield, against 87 datasheets that give one.
Is that cutout difficult?
It is a carpentry job before an electrical one. A 595mm cutout is longer than the clear gap between joists at 450mm centres, so it will almost certainly need a joist trimmed and noggins added. And the cutout is the one dimension that cannot be corrected once cut check the joist direction and spacing before ordering, not on installation day.
What do twin DC motors give me?
The ability to heat and extract at the same time at different rates. The sheet calls it Heat Breeze: heat delivered while low-level extraction runs, so warm air reaches you while moisture is still being pulled out. A single-motor unit has to choose extract hard and you pull the heat straight out, extract lightly and condensation builds. DC motors are also quieter and draw less: 60W for the pair here.
Will it clear steam properly?
That depends more on your duct than on the appliance. The 500 cubic metres an hour is a free-air rating and the duct run reduces it substantially every bend costs flow, flexible duct costs more than rigid, and a long run costs most. The commonest cause of a bathroom heater that does not clear steam is six metres of concertina’d flexible duct with three bends. Keep the run short and straight, pull the flexible duct taut rather than leaving it compressed, and use a free-flowing exterior grille rather than fine mesh.
Is the light bright enough to be the main light?
In most bathrooms, yes 1,800 to 2,100 lumens, which is not true of every heater in this range. Note 4000K is the brightest setting at 2,100lm, not 5000. CRI 80 is adequate for general bathroom use and below what you want at a mirror for close colour work, so a higher-CRI vanity light is worth having alongside if anyone does makeup in the room.
Only logged in customers who have purchased this product may leave a review.
We offer fast and reliable shipping worldwide. All orders are carefully packaged and shipped within 1–3 business days after payment confirmation.
Standard shipping, expedited shipping and express delivery options are available at checkout. Delivery time depends on your destination country and local logistics.